Construction and Infrastructure and Landscaping Work 3 Stages 282 Residents and 48 Stores in Elazig Province Central District Mustafapaşa Neighborhood
Construction and Infrastructure and Landscaping Work 3 Stages 282 Residents and 48 Stores in Elazig Province Central District Mustafapaşa Neighborhood
The contract for the Construction, Infrastructure and Landscaping Work of 3 Stages of 282 Houses and 48 Stores in Elazig Province Central District Mustafapaşa Neighhbourhood, tendered by TOKI on 16.04.2020, is signed on 15.06.2020 at a price of 79.400.000 TL. The term of the work is 200 days. Within the scope of the project with a total construction area of 61,179.16 m², there are a total of 17 blocks, 282 residences and 48 stores consisting of 3 K-A Type 2+1/3+1, 1 K-A5 Type 2+1/3+1, 1 K-A6 Type 3+1, 1 L-B Type 2+1/3+, 1 L-B2 Type 2+1, 1 L-A1 Type 2+1/3+1, 1 L-B Type 2+1/3+1, 1 L-D Type 2+ 1/3+1, 3 M-A Type 2+1/3+1, 3 M-A8 Type 2+1/3+1,
Client | : REPUBLIC OF TURKEY MINISTRY OF ENVIRONMENT AND URBANIZATION Housing Development Administration of Turkey (TOKİ) |
---|---|
Project Name | : Construction and Infrastructure and Landscaping Work 3 Stages 282 Residents and 48 Stores in Elazig Province Central District Mustafapaşa Neighborhood |
Date of Completion | : ../../.... |