ABI Bottling Factory Construction
ABI Bottling Factory Construction
Construction works of Cola and Water bottling factory investment of Afghan Beverage Industries (ABI Group Ltd.) located at Afghan capital of Kabul has been undertaken by our company. The factory and facilities were constructed over 10.000 m2 of land inside the Industrial Zone of Kabul. All the construction works related to substructure and superstructure of the facility together with electrical and mechanical installations and entire landscaping have been delivered as a turn-key project. It also includes concrete laying of bottling and transformer buildings and mechanical, administrative and social facilities beside the entire outdoor area of the factory, and landscaping works.
Bottling Building:
The section which includes an automated filling facility was constructed with an acid resistant ceramic floor covering. Functional spaces like sewage plant, syrup room, test laboratory, administrative rooms, stocking and packaging areas for production and loading are also ready at the section.
Mechanical Building:
It comprises a compressor section, a cold storage for syrups and maintenance and repair sectors.
Transformer Building:
This includes electricity and steam power generator rooms as well as a power distribution unit.
Social Facilities Building:
Fitting rooms, commissary, kitchen, dining hall, resting place, archive, storage, security room, bathroom and toilets are included in the building.
Administrative Building:
With its unique structure including capacious technical and administrative offices with suspended ceilings, study rooms, manager rooms, meeting hall, archive and storage areas, it is a modern office complex.
Client | : Afghan Beverage Industries Ltd. (ABI) |
---|---|
Project Name | : ABI Bottling Factory Construction |
Date of Completion | : November 11th, 2005 |